RFQ Checklist
- Motor model, torque-speed points, Kt / Ke, phase resistance/inductance
- Minimum loaded, nominal, manufacturer-specified maximum charged, and expected transient bus voltage
- Exact drive operating and absolute-maximum voltage limits, overvoltage response, and manufacturer-approved regeneration path
- Cooling interface, ambient range, enclosure, cable lengths, and connector voltage/current/interruption ratings
- Braking energy and repetition, battery charge acceptance, exact drive-approved energy path, and component limits
- Encoder model, protocol/version, safety requirements, drawings, quantity, target date and acceptance criteria
